Context
During coordination discussions on an active MEP model, a tolerance of 1 mm for system clearance and placement was proposed as a coordination baseline.
At first glance, millimeter-level precision appears ideal in a digital environment. However, when examined through the lens of fabrication and site installation realities, such precision introduces significant constructability risks.
This note explores why micro-precision in BIM coordination can distort rather than improve project outcomes.
The Modeling Illusion
Revit and clash detection tools provide consistent, rule-based, and predictable geometric results.
Objects intersect or they do not. A 1 mm offset is mathematically precise and visually convincing.
On site, however, installation conditions are fundamentally different.
Fabrication and installation of ducts, piping, cable trays, and equipment typically involve positional deviations that may range from ±5 mm to ±20 mm, depending on:
- Support systems and hanger tolerances
- Field alignment adjustments
- Material behavior
- Site constraints and accessibility
- Human installation variability
Model precision does not equal field precision.
When model tolerances are set below realistic construction capabilities, coordination becomes disconnected from buildability.
Technical Consequences of Over-Precision
Enforcing a 1 mm tolerance in clash detection produces several predictable outcomes:
- A high volume of false-positive clashes
- Increased coordination workload
- Escalation of micro-adjustments that do not improve constructability
- Decision fatigue during review meetings
- Artificial misalignment between the “clash-free” model and real-world installation conditions
Rather than increasing quality, extreme sensitivity increases noise.
The coordination process shifts from resolving meaningful spatial conflicts to resolving mathematically triggered but practically irrelevant intersections.
What Industry Practice Suggests
Academic literature and BIM coordination guidance consistently emphasize:
- Staged modeling strategies
- Realistic clearance thresholds
- Fabrication-informed tolerances
- Alignment between digital precision and site capability
There is no universal tolerance number applicable to all projects.
Tolerances must be derived from:
- Fabricator capability
- Project complexity
- System criticality
- Installation sequencing
- Client requirements
The principle is consistent across sources:
Tolerance standards must reflect constructability, not millimeter-level modeling accuracy.
A Practical Tolerance Framework
A structured approach can balance digital clarity with real-world feasibility:
| Coordination Stage | Recommended Range |
|---|---|
| Early routing / layout stage | ±20 mm |
| Standard MEP coordination | ±10 mm |
| Critical systems only | ±5 mm (case-specific) |
| Hard clash rule | 0 mm (solid interference only) |
Additionally:
- Clearance rules (e.g., 50 mm service zones) should be distinguished from hard clashes.
- Clash detection settings in Navisworks or similar tools should align with defined project tolerances.
- Tolerance tables should be documented within the BIM Execution Plan to ensure discipline-wide consistency.
This staged structure reduces clash noise while preserving technical rigor.
Note: Information compiled through standard academic research practices reviewing BIM coordination guidelines, known academic publications on tolerances, and manufacturer/MEP fabrication standards. I focused on information that is commonly accepted in the BIM community and cross-referenced them with recognized best practices.
Important to remember: Not a single document sets a universal number. Tolerances are obtained from fabricator capabilities, site conditions, and coordination best practices. The ±10 mm value is an industry-aligned coordination standard, not an arbitrary rule.