Archive
Field notes
Practical notes from BIM coordination and engineering work: mistakes, patterns, and what I'd do differently next time.
- Index
- 11 entries
- Latest
- 24 May 2026
FN-11Latest When Coordination Moves Ahead of Clarity Why fast-track projects create a specific kind of pressure, where model coordination can outpace design clarity, and the hidden risks of producing confident outputs from incomplete or unstable information. Read - FN-11 When Coordination Moves Ahead of Clarity Why fast-track projects create a specific kind of pressure, where model coordination can outpace design clarity, and the hidden risks of producing confident outputs from incomplete or unstable information.
- FN-10 Silent Divergence: How Teams Lose Their Shared State When project state lives in people's heads rather than a shared artifact, disciplines quietly drift apart, causing re-coordination to explode. Here is the protocol to stop it.
- FN-09 Why Coordination Becomes Reactive (And How to Fix It) How local changes create systemic ripple effects across disciplines, leading to coordination debt, and the practical framework needed to stop it.
- FN-08 The Framework Trap: Why Perfect Systems Fail on Chaotic Teams Why most BIM and coordination frameworks fail in practice, and how to transition teams from WhatsApp chaos to disciplined execution.
- FN-07 Intent Is a Deliverable A lightweight closure system that keeps BIM markup comments from turning into hidden risk.
- FN-06 The Next Layer of BIM Maturity: AI, Agents, and the Governance Gap A reflection on how BIM coordination will shift when AI agents begin participating in project decisions, and why AEC will need clear change governance protocols, not just smarter automation.
- FN-05 The 2D Mindset in a 3D World: When ‘Simple’ Requests Become Expensive The friction between 2D thinking and 3D parametric modelling in BIM, and why ‘simple’ changes to ceilings, clearances and MEP routes cost more than they look.
- FN-04 Context Shifting in BIM: The Hidden Cost of Switching Projects A research-backed field note on why multi-project BIM work feels mentally heavy, and the structural solution.
- FN-03 The Gap Between Design Intent and Engineering Reality Interior Design (ID) vs. MEP and structural coordination in high-stakes projects: where design intent meets ceiling space, clearances and services.
- FN-02 Lessons on Quality Control in BIM Coordination Why most BIM coordination failures are systemic rather than geometric, and what quality control has to check beyond clash detection.
- FN-01 Why 1 mm Is a Modeling Illusion Tolerance discipline in BIM MEP coordination: why millimetre-perfect models create false precision, and how tolerances and clearances should shape clash rules.